This Logistics Park required over 2,500,000 ft² of warehousing and production areas together with associated HGV trailer spaces and staff parking areas, all on the 250 acre site.
The site was previously in use as an open cast mine to a depth of some 16m before backfilling, which required a rolling cycle of soil surcharge in advance of the phased construction.