A heavily contaminated site as a result of being used to dump slag and flue dust from the adjacent steelworks, the redevelopment had to accommodate the possible future movement of the lens of slag underlying much the development and design solutions for foundations/slabs and external hardcover accordingly.
Recent Projects
Latest Tweets
Congratulations to Lizzie Roberts, Ben Chapman and Nathan Clark from our Norwich office who completed the Sandringham 10K last week, with each of them posting Personal Best times!
#pinnacleconsultingengineers #civilengineering #structuralengineering #pinnaclepeople
Pinnacle’s Welwyn and Norwich offices held Macmillan Coffee Mornings last week, raising over £1,000 for Macmillan Cancer Support.
#pinnacleconsultingengineers #civilengineering #structuralengineering #pinnaclepeople
Pinnacle entered a Lego competition hosted by NFCI (Norwich Forum for the Construction Industry) on 25 September. Pictured is Pinnacle’s entry and the winning Eiffel Tower construction.
#pinnacleconsultingengineers #civilengineering #structuralengineering #pinnaclepeople #NFCI
Pinnacle’s Dimitris Elliniadis is attending today’s Institution of Civil Engineers East of England event debating the issues surrounding resilient infrastructure.
#pinnacleconsultingengineers #civilengineering #ice #infrastructure #sustainability
Pinnacle’s Zuzanna Towarek and Christoph Nobbe enjoyed attending the German Datacenter Conference this week. It was a great opportunity to connect with some new contacts as well as some familiar faces. #pinnacleingenieurbüro #GDACon24