Read More

Stanion Logistics Park

Corby, Midlands

This Logistics Park required over 2,500,000 ft² of warehousing and production areas together with associated HGV trailer spaces and staff parking areas, all on the 250 acre site. The site was previously in use as an open cast mine to a depth of some 16m before backfilling, which required a ro…
Read More
Read More

Structural design of a Distribution Centre

Peterborough

This project called for the structural and civil design of a 350,000ft2 distribution warehouse, including a 80,000ft2 RSU for our client. In addition there was a requirement for associated ancillary buildings to be located within the 54 acre site. We undertook the structural and civil design f…
Read More
Read More

MAN2 Distribution Centre

Warrington

This client required the retro-fitment of a new base build shed approximately 350,000ft² to incorporate two 300,000ft² mezzanine floors and a new two-storey office building on the 42 acre site. The project was required incredibly urgently, so we devised a fast-track construction programme th…
Read More