Structural Surveys

Our offshore structural condition surveys, in which we visit installations by either marine or helicopter, are carried out by qualified structural engineers and are undertaken to enable accurate and informative condition reporting of existing assets to be determined, using risk based assessments.

Accurate and informative reporting

Our reports can then be used to instigate any necessary remedial actions in a timely manner, so as to prevent unscheduled production shutdowns and thereby minimise cost of operation. Regular inspections also form a vital tool in managing safety and ensuring the continued safe access across the platform. Corrosion and coating breakdown, damage or deterioration of gratings, stairs and handrails, as well as any deformation, damage or deterioration of structural elements are all routinely reported upon.

Surveys and inspections

In addition to our structural design service, we regularly attend offshore manned nodal and normally unmanned installations (NUIs) in order to carry out localised and specific structural dimensional surveys and inspections. This provides clarification of structural detail, dimensional checks and confirms the condition of existing areas or structures.

These enable design assumptions to be confirmed, on station, prior to fabrication or construction works, thus ensuring an efficient installation or construction process on site.

Qualifications and certification

Our Offshore Structural Engineers have the following certification:

  • BOSIET
  • MIST
  • S-Cape
  • CSCS

We also have engineers with BST GWO Work at Height/Renewable UK Work at Height and Rescue (WAHR) and Working at Heights qualifications.

Every offshore survey is backed up with a clear, concise, accurate and informative written report with appropriate photographs and location plans. Where appropriate; recommended remedial actions, along with suggested timescales, are included within our written reports in order to better inform the reader of the severity of any issues raised.

Case Studies

Read More
As part of the interfacing of drilling rig (Ensco 122) with nodal gas platfor…
Read More
Read More
That was the question posed by our client. The answer: substitute helicopters…
Read More
Read More
In July 2014, Shell/NAM commenced a well clean out and fracking project on th…
Read More
Read More
In 2011 Shell / NAM commenced a campaign of well rejuvenation to gas wells wi…
Read More
Read More
As part of the interfacing of drilling rig (Ensco 122) with nodal gas platfor…
Read More
Read More
That was the question posed by our client. The answer: substitute helicopters…
Read More
Read More
In July 2014, Shell/NAM commenced a well clean out and fracking project on th…
Read More
Read More
In 2011 Shell / NAM commenced a campaign of well rejuvenation to gas wells wi…
Read More

Find out more

Please contact us